Place OSHA and EPA Certified Logos as well as the Certified Air Balance Residential and Nate Logos on this page
Niksic provides the following:
Mechanical Scope: Installation of 1-240-ton air cool
turbo cord chiller R-134 A/ Mag level compactors, 135
vertical stock fan coils FCU 1-23 with valve packaging
and controls, VAV's, and gas piping.
Mechanical Scope: Installation of 2 air cooled
chillers per plans and specs, In-terlocked existing
MAV with new controls and 3 VAVs complete
with controls.
Mechanical Scope: Installation of 1-VAV 1 laboratory exhaust fan, 1-ACCU1 (Air cooled A/C unit), 1-B1 & B2 boiler, 20 hot water coils (TRANE), 33 VAV terminal boxes and 208 TITUS air devices.
Mechanical Scope: Installation of 93-ton VRF system
for 14 story building, complete piping system
(copper), 114 Fan Coils, 30-ton dedicated
air systems and 2coolers/1 freezer.
Mechanical Scope: Installation of garage CO/NO exhaust system, 1-10,000 CFM and 1-15,0000 CFM, central supply system, ductwork and Roof Top Units with split systems.